Local Engineering Context
Portsmouth Ground & Substructure Context
High coastal water tables across Portsea Island clay/alluvium necessitate Type B/C tanking, raised flood-mitigated FFLs, and piled foundations.
South East England · England · BS 8102 Type A/B/C Structural Waterproofing
Our waterproofing estimating service for Portsmouth projects translates architectural, structural, and engineering drawings into transparent BS 8102 Type A/B/C Structural Waterproofing schedules. Whether tendering across South East England under JCT or NEC procurement, every takeoff accounts for island-city dense brownfield housing/pbsa schemes, naval heritage dockyard stonework refurbishments, marine engineering sheds, and extensions.
Local Engineering Context
High coastal water tables across Portsea Island clay/alluvium necessitate Type B/C tanking, raised flood-mitigated FFLs, and piled foundations.
Local Engineering Context
Channel gale exposure drives enhanced roof clip/sarking specs, salt-resistant masonry mortar grades, and heavy-duty coastal glazing. Scheduled in line with Building Regulations (Approved Documents Parts A–S) & Building Safety Act (BSA) Gateways 1–3.
Local Engineering Context
Tight Victorian terrace plots on Portsea Island limit skip/scaffold footprints and require clean urban waste management.
Measurement & Deliverable Parameters
| Estimating Parameter | Technical Specification | Standard / Audit Basis |
|---|---|---|
| Measurement Section & Units | BS 8102 Type A/B/C Structural Waterproofing measured in m2, m, nr | Scaled GA plans at 1:50 / 1:100 or structural details in mm |
| Local Statutory Framework | Building Regulations (Approved Documents Parts A–S) & Building Safety Act (BSA) Gateways 1–3 | England statutory & local tender compliance notes |
| Wastage & Prelim Separation | Net quantities isolated with 5%–10% typical trade waste allowances | Portsmouth logistics and phased delivery allowances |
| Deliverables & Drawing Uploads | 100% open-formula Excel BoQ + colour-coded PDF overlays (up to 25 MB upload) | 24–48 hrs turnaround target for focused single-trade packages |
Calibration note: 1:50 and 1:100 architectural and structural drawings are scaled to 25 mm masonry tolerances and 100 mm thermal zones, isolating 5 percent to 10 percent wastage from net quantities.
UK basements, lift pits, and podium slabs carry strict BS 8102 Grade 3 habitable criteria where omitting one service-penetration collar or perimeter drainage channel causes expensive leaks. Our CSSW-style measurement covers full triple/dual combined systems.
Tight Victorian terrace plots on Portsea Island limit skip/scaffold footprints and require clean urban waste management. Alongside Separates vertical retaining wall tanking (plus 500mm floor/ceiling laps), lift shaft pit linings, and podium inverted waterproofing. Our Excel workbooks separate measured quantities cleanly from site-specific prelim and access allowances.
Upload scaled PDFs, DWG/DXF CAD files, Revit/IFC BIM models, or NBS specifications directly via our online tender desk—every waterproofing estimating pack returns editable Excel schedules and marked-up PDF sheets.
Yes. Type A external liquid/sheet membranes, Type B integral waterstops at day joints, and Type C internal cavity drained membranes/channels are itemised in clear layers.