Power, Lighting, Containment & ELV · NRM2 Section 39 (Electrical Engineering Services)

UK Electrical Estimating Services (BS 7671 Compliant Takeoffs)

Full electrical engineering takeoffs measuring containment tray/trunking, SWA sub-mains, luminaire types, small power accessories, distribution boards, fire alarms, and EV charging.

How is electrical measured under RICS NRM2?

Competitive UK electrical bidding demands point-by-point discipline across lighting controls (DALI/PIR), containment separation (power vs Cat6A), BS 5839 fire detection zones, access control, and 18th Edition BS 7671 protective switchgear. We provide ready-to-price Excel schedules built to ECA-style workflows.

  • Breaks down SWA sub-main runs using vertical riser heights plus floor horizontal cable-tray pathways and gland kits.
  • Isolates fire-rated FP200/enhanced cabling for smoke vents, dry-riser interfaces, and evacuation alarms.

Which deliverables and drawings are involved?

  • Point-count & accessory schedule by room/floor
  • Sub-main SWA & containment linear takeoff
  • Fire alarm, emergency lighting & testing/NICEIC checklist

Drawings & Inputs Accepted

  • Lighting, small power & containment layouts
  • Fire alarm, security & data ELV plans
  • LV schematic & distribution board schedules

Measurement & Deliverable Parameters

How are UK electrical takeoffs structured for tender accuracy?

Electrical Estimating — UK Measurement Units, Deliverables & Workflow Specification
Estimating ParameterTechnical SpecificationStandard / Audit Basis
Work Breakdown & UnitsNRM2 Section 39 (Electrical Engineering Services) in m, nr, circuits, setsScaled PDF / DWG plans at 1:50 & 1:100 (dimensions in mm / m)
Waste & Prelim SeparationNet physical takeoff plus 5%–10% typical trade waste splitKeeps net order counts transparent for merchant tenders
Deliverable Workbook100% unlocked formula Excel + colour-coded PDF overlaysIncludes formal RFI log flagging drawing ambiguities
Turnaround & File Transfer24–48 hrs (domestic/single trade) · up to 25 MB uploads3–5 working days typical for multi-trade commercial tenders

Calibration note: 1:50 and 1:100 architectural and structural drawings are scaled to 25 mm masonry tolerances and 100 mm thermal zones, isolating 5 percent to 10 percent wastage from net quantities.

Where is electrical estimating typically applied across UK projects?

Commercial Cat A/B office electricalMulti-dwelling residential 1st & 2nd fixIndustrial high-bay LED & 3-phase powerEV charging hub & solar PV containment

Targeted UK Coverage

Electrical Estimating by UK City, County & Postcode District

Commercial Postcodes

Related Construction Trades

Electrical Estimating FAQs

Do electrical takeoffs include cable tray, basket, conduit, and dado trunking lengths?

Yes. Cable management pathways are measured separately by width/gauge alongside drop rods and earthing continuity bonds.

Are DALI lighting controls, emergency exit signs, and PIR sensors counted individually?

Yes—each luminaire code (normal, emergency maintained/non-maintained, self-test), presence detector, and scene plate is counted cleanly.

Do you measure structured cabling (Cat6/Cat6A), fibre backbones, CCTV, and door access?

Yes. Data outlets, patch cabinets, CCTV cameras, Paxton/access readers, and video intercoms are detailed cleanly.