Local Engineering Context
Somerset Geology & Substructure Drivers
High-water-table peat in Somerset Levels requiring piled rafts vs Mendip/Bath limestone formations.
South West England · England · NRM2 Full Work Sections 1–41
Serving builders, specialist subcontractors, and developers working throughout Somerset, our construction estimating service delivers transparent NRM2 Full Work Sections 1–41 bills of quantities calibrated around clean-energy/infrastructure civil pads, bath stone townhouse refurbishments, and regional rural residential estates.
Local Engineering Context
High-water-table peat in Somerset Levels requiring piled rafts vs Mendip/Bath limestone formations.
Local Engineering Context
Bath stone ashlar dressing, lime-mortar breathable restoration plasters, and clay pantiles.
Local Engineering Context
Phosphates mitigation SuDS treatment ponds and agricultural-access crane/lorry sizing.
Measurement & Deliverable Parameters
| Estimating Parameter | Technical Specification | Standard / Audit Basis |
|---|---|---|
| Measurement Section & Units | NRM2 Full Work Sections 1–41 measured in m2, m3, m, nr, t, item | Scaled GA plans at 1:50 / 1:100 or structural details in mm |
| Local Statutory Framework | Building Regulations (Approved Documents Parts A–S) & Building Safety Act (BSA) Gateways 1–3 | England statutory & local tender compliance notes |
| Wastage & Prelim Separation | Net quantities isolated with 5%–10% typical trade waste allowances | Somerset County logistics and phased delivery allowances |
| Deliverables & Drawing Uploads | 100% open-formula Excel BoQ + colour-coded PDF overlays (up to 25 MB upload) | 24–48 hrs turnaround target for focused single-trade packages |
Calibration note: 1:50 and 1:100 architectural and structural drawings are scaled to 25 mm masonry tolerances and 100 mm thermal zones, isolating 5 percent to 10 percent wastage from net quantities.
Designed for UK main contractors, regional builders, specialist subcontractors, and developers bidding JCT Design & Build, Traditional, or NEC4 packages. Every item is cross-referenced directly to your architectural, structural, and MEP drawing register.
Every workbook provides net measured quantities in m2, m3, m, nr, t, item, colour-coded PDF drawing mark-ups, separated material vs labour lines, and clarifications covering Somerset site requirements.
Schedules can be structured to RICS NRM2 work sections, SMM7 conventions, or your in-house contractor tender workbook format in Excel.
Yes. Every tender pack includes an RFI and clarification log flagging missing structural details, unscheduled ironmongery, or provisional M&E allowances.