Local Engineering Context
Oxfordshire Geology & Substructure Drivers
Cotswold oolitic limestone formations contrasted with Oxford Clay in lower Thames river basins.
South East England · England · NRM2 Full Work Sections 1–41
Serving builders, specialist subcontractors, and developers working throughout Oxfordshire, our construction estimating service delivers transparent NRM2 Full Work Sections 1–41 bills of quantities calibrated around r&d science park cleanrooms/labs, collegiate/university refurbishments, and cotswold stone rural developments.
Local Engineering Context
Cotswold oolitic limestone formations contrasted with Oxford Clay in lower Thames river basins.
Local Engineering Context
Natural stone ashlar/rubble dressing, stone slate roofing, and high university EPC decarbonisation specs.
Local Engineering Context
Strict heritage access routes in central Oxford and laboratory specialist M&E containment across Harwell/Milton.
Measurement & Deliverable Parameters
| Estimating Parameter | Technical Specification | Standard / Audit Basis |
|---|---|---|
| Measurement Section & Units | NRM2 Full Work Sections 1–41 measured in m2, m3, m, nr, t, item | Scaled GA plans at 1:50 / 1:100 or structural details in mm |
| Local Statutory Framework | Building Regulations (Approved Documents Parts A–S) & Building Safety Act (BSA) Gateways 1–3 | England statutory & local tender compliance notes |
| Wastage & Prelim Separation | Net quantities isolated with 5%–10% typical trade waste allowances | Oxfordshire County logistics and phased delivery allowances |
| Deliverables & Drawing Uploads | 100% open-formula Excel BoQ + colour-coded PDF overlays (up to 25 MB upload) | 24–48 hrs turnaround target for focused single-trade packages |
Calibration note: 1:50 and 1:100 architectural and structural drawings are scaled to 25 mm masonry tolerances and 100 mm thermal zones, isolating 5 percent to 10 percent wastage from net quantities.
Designed for UK main contractors, regional builders, specialist subcontractors, and developers bidding JCT Design & Build, Traditional, or NEC4 packages. Every item is cross-referenced directly to your architectural, structural, and MEP drawing register.
Every workbook provides net measured quantities in m2, m3, m, nr, t, item, colour-coded PDF drawing mark-ups, separated material vs labour lines, and clarifications covering Oxfordshire site requirements.
Schedules can be structured to RICS NRM2 work sections, SMM7 conventions, or your in-house contractor tender workbook format in Excel.
Yes. Every tender pack includes an RFI and clarification log flagging missing structural details, unscheduled ironmongery, or provisional M&E allowances.