How is rebar & reinforcement measured under RICS NRM2?
When engineers issue reinforced concrete drawings ahead of formal bending schedules—or when groundworkers need fast verification of rebar merchant quotes—we extract bar lengths, shape allowances, lap lengths (typically 40–50D), shear links, L-bars, and A142/A252/A393/B503 mesh sheets.
- Separates small-diameter links (8mm/10mm) and heavy bars (20mm–32mm+) due to differing cut-and-bend fabrication rates.
- Adds realistic BS EN 1992 lap, starter-bar bend, and continuity strip allowances.