How is insulation measured under RICS NRM2?
UK Approved Document Part L uplifts require tighter thermal envelopes and zero cold-bridging gaps. Our schedules quantify every thickness and lambda-grade board (PIR/Phenolic, mineral wool batts, EPS/XPS below-slab, wood-fibre) with pack counts and perimeter Perimeter upstand strips.
- Accounts for rafters/joists displacement deductions when comparing between-rafter vs over-rafter continuous PIR layers.
- Covers External Wall Insulation (EWI) base tracks, mesh adhesives, corner beads, and reveal trims.